How could we improve Flow?

even better reporting

I would like to see more reporting features. It would be amazing to see how long a task has sat in each section. I have a draftsman and I want to see how long it takes from him to move it from the backlog to "in progress" and how long it sits "in progress". I know I can see that on the timestamps on the side but having a dedicated section for high level reporting would be great.

Also, super excited for the gantt charts.

1 vote
Vote
Sign in
(thinking…)
Password icon
Signed in as (Sign out)
You have left! (?) (thinking…)
Anonymous shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

0 comments

Sign in
(thinking…)
Password icon
Signed in as (Sign out)
Submitting...

Feedback and Knowledge Base